One week later, with the rain I was able to stay focused most the week and accomplished great things.
Recapping... We moved the center island stove to the east wall, moved the dish washer to the north wall, moved the refrigerator to the west wall. Rewired the stove, dishwasher and refrigerator. Moved the gas lines to the west wall and added a nifty BBQ port on the patio. Added an electrical outlet for the patio by the fish pond. Re plumbed the refrigerator water to the west wall. (Almost, one connection to go) The floor needs the old center vent pipe holes repaired, sanded and re stained to Cherry. The Cabinets need to be stripped, sanded and re stained to a nice rich warm color.
No comments:
Post a Comment